Heavy duty hose clamp W1 44-47mm
1 Heavy Duty hose clamp band width:18mm 20mm 22mm 24mm 26mm
2 Heavy duty hose clamp Material:Stainless steel SS201 SS304 SS316,galvanized mild steel.
3 Thickness of heavy duty clamp W1 band:0.6mm 0.8mm 1.2mm 1.5mm 1.7mm
4 Single Bolt Heavy Duty Hose Clamp Size:44-47mm
Larger sizes can be customized as per drawing
Heavy Duty Hose Clamp W1 44-47
Tianjin Techi industrial Co., (www.techiclamp.com)is the well-known manufacturer of single bolt hose clamp,heavy duty hose clamp W1 galvanised, robust Heavy Duty Hose Clamps. we produce high resistant multiple use clamps for pressures and significant clamping forces. robust heavy duty clamps W1 are provided with three welding points and raised edges
1.Material : Stainless steel 201,zinc plated galvanized steel,Mild steel
2.Standard: SAE J1508
3.Feature: (1)Bigger adjusting range (2) Evenly stress when fastening (3) Wrest resistant and high crushing strength(4) Moderate price (5) Corrosion resistant , and protects the rubber surface is not damaged (6) Can smoothly , can be reused (7) Ideal fastener of all kinds of gentle and harsh pipes
Application: To auto pipe , motor pipe , water pipe , cooling pipe , gas pipe ect.
Heavy Duty Hose Clamp 44-47
Bandwidth :18mm ,20mm,22mm,24mm,26mm
Size | W1 | W2,W4,W5 | Screw |
Diameter (mm) | Thickness X Width(mm) | Thickness X Width(mm) | |
Heavy duty hose clamp 17-19 | 0.6×18 | 0.6×18 | M5X40 |
Heavy duty hose clamp 20-22 | |||
Heavy duty hose clamp 23-25 | |||
Heavy duty hose clamp 26-28 | |||
Heavy duty HD hose clamp 29-31 | 0.8×20 | 0.6×20 | M6X50 |
Heavy duty HD hose clamp 32-35 | |||
Heavy duty HD hose clamp 36-39 | |||
Heavy duty HD hose clamp 40-43 | |||
Deavy duty Hose clamp 44-47 | 1.2×22 | 0.8×22 | M6X55 |
Deavy duty Hose clamp 48-51 | |||
Deavy duty Hose clamp 52-55 | |||
Deavy duty Hose clamp 56-59 | |||
Deavy duty Hose clamp 60-63 | |||
Deavy duty Hose clamp 64-67 | M8X60 |
heavy duty hose clamp W1 galvanized Package and production lines
Payment & Shipping Terms | Supply Capacity | ||
Payment Term: | L/C, Western Union, D/P, T/T | Production Capacity: | 80000 Per Day |
MOQ: | 500 Piece/Pieces | Packing: | 100/carton |
Means of Transport: | Land, Ocean,Air | Delivery Date: | 15 working day |